Mainland Water Rate & Fee Schedule

  • Water Consumption Charges

    Effective July, 1, 2011

    Consumption/Month (in gallons)* Residential Commercial** 
    0 - 2000 Base Rate ($20.00) Base Rate ($20.00)
    Up to 5,000$4.50 per 1,000 gallons$4.50 per 1,000 gallons
    Up to 10,000 $5.50 per 1,000 gallons $5.50 per 1,000 gallons
    Up to 15,000 $6.50 per 1,000 gallons $6.50 per 1,000 gallons
    Up to 20,000 $7.50 per 1,000 gallons $7.50 per 1,000 gallons
    All over 20,000$8.50 per 1,000 gallons$8.50 per 1,000 gallons

    * Consumption over 2,000 gallons is billed retroactive to the first gallon used.
    **Commercial master meter accounts are charged at the above rates per unit served. Hotels and motels: Four rooms equal one commercial master meter billing unit.

    Local Government/Board of Education –  same as commercial rates.

    Fire Service (sprinkler systems) –  same as commercial rates.

     

     

  • Impact Fees

    Effective July 1,2016

     

    Meter Size

     

    Impact Fee

     
    3/4 inch

    $5,000

    1 inch

    $5,500

    2 inch

    $6,000

    3 inch

    $6,500

    4 inch

    $7,000

    6 inch

    $7,500

    6 inch fire service

    $6,000

    1 inch for centers of worship

    $3,000

    3/4 inch irrigation meter

    $1,000

    1 irrigation meter

    $1,300

    All installation costs for labor, materials and equipment shall be paid by the owner, developer or purchaser, except for centers of worship, where the impact fee includes labor, materials and equipment. Additional fees for centers of worship will only be charged for larger size meters, labor, materials and equipment above 1 inch.

  • Deposit

    Renter deposit
    $150
    High-risk deposit (owner or renter)
    *$200
    Fire hydrant meter
    $2.500
    * or 3 months' billing of previous usage, whichever is greater

  • Charges & Other Fees

    Open/reopen/transfer account $25
    Special request meter reading $25
    Reread meter - our reading correct $25
    Reread meter - our reading incorrect N/C
    Reconnection fee (after cutoff for nonpayment)  
      8:00 a.m. - 5:00 p.m$50
    Returned check fee $25
    Meter tampering fee $75
    Turn on/off fee, per occurrence
      Normal working hours $25
    Meter testing fee
      If meter accurate $50
      If more than 2.5% inaccurate N/C
    Pipe pressure/leakage test $150
    Pipe pressure/leakage retest $150
    Fire hydrant meter setup fee $50
    Meter accessibility charge $35
    Bacteriological tests$50
    Chloride tests$20

  • Parts & Labor

    All replacement parts are charged at cost plus 20%.
    Labor charges: $60.00 per man per hour
    Ditch Witch:$125.00 per hour
    Backhoe: $125.00 per hour
    Excavator:$125.00 per hour